首页> 美国政府科技报告 >Terminal Doppler Weather Radar (TDWR) Build 5 Test and Evaluation Master Plan (TEMP).
【24h】

Terminal Doppler Weather Radar (TDWR) Build 5 Test and Evaluation Master Plan (TEMP).

机译:终端多普勒天气雷达(TDWR)构建5测试和评估总体规划(TEmp)。

获取原文

摘要

This document presents the Terminal Doppler Weather Radar (TDWR), Build 5 enhancement, Test and Evaluation Master Plan (TEMP). This Build 5 TEMP identifies Operational Test and Evaluation (OTE) objectives, responsibilities, resources, schedules, and critical test issues. The Build 5 enhancement consists of a Build 5A which provides connectivity to the Low Level Wind Shear Alert System (LLWAS) II, and a Build 5B which provides connectivity to an LLWAS III. Build 5A displays LLWAS II wind data along with TDWR hazardous weather data on TDWR Geographic Situation Displays (GSD) and Ribbon Display Terminals (RDT). Build 5B provides additional capabilities such as having a Microburst Shear Integration Algorithm (MSIA), TDWR/LLWAS III Integration Algorithm, 15-day archiving and TDWR, LLWAS II and LLWAS III data integration. Terminal Doppler Weather Radar (TDWR), Test and Evaluation Master Plan, Build 5, Operational Test and Evaluation (OTE).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号