首页> 美国政府科技报告 >Lake Washington Ship Canal, Seattle, Washington. Master Plan (DM 9)
【24h】

Lake Washington Ship Canal, Seattle, Washington. Master Plan (DM 9)

机译:华盛顿湖运河,西雅图,华盛顿。总体规划(Dm 9)

获取原文

摘要

This February 1994 Lake Washington Ship Canal Master Plan (Design Memorandum 9),has been prepared to guide the use and development of the natural and manmade resources at the project, which is administered by the Seattle District, US Army Corps of Engineers. Project resource development and management actions are measured against a management framework which includes resource objectives and concise land management measures for individual project sites and features. The Master Plan will serve to increase resource management effectiveness and provide the basis for the preparation of follow-on operation management plans (OMP), prescribed by ER 1130-2-400, and feature design memorandums (FDM). Master plan, Land allocation, Land classification.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号