首页> 美国政府科技报告 >NASPAC-Based Analysis of the Delay and Cost Effects of the Western-Pacific RegionPreliminary Resectorization Effort of 1993
【24h】

NASPAC-Based Analysis of the Delay and Cost Effects of the Western-Pacific RegionPreliminary Resectorization Effort of 1993

机译:基于NaspaC的西太平洋区域延迟和成本效应分析1993年的初步研究工作

获取原文

摘要

This report contains the findings and analysis of the effects of the Western-Pacific Region (AWP) Preliminary Resectorization Plan of 1993 on local (AWP airports) and system-wide traffic delays. The National Airspace System Performance Analysis Capability (NASPAC) was used to perform this task, and calculates the local and system-wide delays with and without the AWP Resectorization Plan. Cost of delay was derived using the Cost of Delay Module based on these delays, on passenger cost, and on airline and aircraft specific cost. The results indicate that the proposed resectorization will reduce the operational delay in years 1995 and 2000 at most AWP airports and system-wide with the maximum benefit occurring in the year 2000. On the other hand, resectorization does not favor the passengers for the future years modeled However, in year 2000, the increase in passenger delay is less than for year 1995.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号