首页> 美国政府科技报告 >Work Plan for Engineering Evaluations/Cost Analyses at Hangar 10 and Site ST41, Elmendorf Air Force Base, Anchorage, Alaska
【24h】

Work Plan for Engineering Evaluations/Cost Analyses at Hangar 10 and Site ST41, Elmendorf Air Force Base, Anchorage, Alaska

机译:阿拉斯加安克雷奇埃尔门多夫空军基地机库10和sT41站的工程评估/成本分析工作计划

获取原文

摘要

This work plan was prepared by Engineering-Science, Inc. (ES) and presents the scope of work required for the collection of data necessary to conduct an engineering evaluation/cost analysis (EE/CA) for remediation of fuel- hydrocarbon-contaminated ground water at two sites at Elmendorf Air Force Base (AFB), Anchorage, Alaska. The two sites to be addressed are the Hangar 10 site and site ST4l (locally known as Four Million Gallon Hill). Several remedial options will be evaluated during the EE/CA, including free product removal; ground water extraction, treatment, and re-injection (i.e., pump and treat); air sparging; and intrinsic remediation with long-term monitoring (intrinsic remediation). All hydrogeologic and ground water chemical data necessary to evaluate the various remedial options will be collected under this program; however, this work plan is oriented toward the collection of hydrogeologic data to be used as input into the Bioplume II ground water model in support of the intrinsic remediation (intrinsic remediation) with long-term monitoring remedial option for restoration of fuel hydrocarbon-contaminated ground water.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号