首页> 美国政府科技报告 >Environmental Assessment to Repair/Modify Drainage and Remove Headwalls on Runway 17/35 and Taxiway D.
【24h】

Environmental Assessment to Repair/Modify Drainage and Remove Headwalls on Runway 17/35 and Taxiway D.

机译:在17/35号跑道和滑行道D上修复/修改排水和拆除端墙的环境评估。

获取原文

摘要

The 82d Training Wing (82 TRW) proposes to modify an existing drainage ditch northeast of building 1360 which continues to runway 17/35. and then moves east approximately 1630 feet towards Taxiway D. This would include removing 14 existing headwalls and constructing and enclosing the system underground by using a buried system of pipes and inlets. This Environmental Assessment (EA) is an evaluation of the proposal to modify the existing or migrating through the airfield which poses a safety concern for flying operations, unclogs the drainage ditch by allowing the water to flow down a gradient, and eliminates the effects of standing water and erosion due to being exposed to the elements.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号