首页> 美国政府科技报告 >Contact Management Model Assessment System for Contact Tracking in the Presenceof Model Uncertainty and Noise
【24h】

Contact Management Model Assessment System for Contact Tracking in the Presenceof Model Uncertainty and Noise

机译:模型不确定性和噪声下接触跟踪管理模型评估系统

获取原文

摘要

A system for providing an iterative method of assessing accuracy of selectedmodels of physical phenomena and for determining selection of alternate models in response to a data sequence in the presence of noise. Initially, a residual sequence is generated reflecting difference values between in response to said data sequence and an expected data sequence as would be represented by a selected model. Feature estimate values of a plurality of predetermined data features in the residual sequence are then generated. In response to the feature estimate values, a threshold value is generated for each feature at an estimated ratio of data to noise power. Probability values are generated in response to the threshold value, representing the likelihood that the feature exists in the data sequence, does not exist in the data sequence, and that the existence or nonexistence in the data sequence is not determinable, along with an amplitude probability value indicating the belief of the amplitude of the respective feature in the data sequence. Probability values are generated in response to the feature existence' and amplitude probability values, representing the likelihood that various modelling hypotheses are represented by the observed features, or are not ruled out by the observed features in the presence of the given noise level. Finally, a model is selected in response to the probability values for use during a subsequent iteration.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号