Application of Scheduling Program to Data and Configuration Management Deliverables.

机译:调度程序在数据和配置管理可交付成果中的应用。

获取原文

摘要

NSRP Report 02931 describes the development of a computer program that provides a shipyard with integrated schedules for developing the drawings and for ordering the equipment necessary for a shipbuilding program. The program integrates these schedules with one another and with the block erection schedule that controls the construction process. This document describes how to use the application program to generate each required schedule. Integrated means not only that the schedules which are generated by the program take into account all of the interrelationships between the several steps involved in the drawing development process and the many steps involved in the equipment procurement process, but also means that these schedules ensure that the appropriate drawings, equipment information and equipment are available inadequate time to support each element in the construction planning and implementation process. The program can also be used to produce the schedule for constructing and erecting blocks, if that data is not available through other means for entry into the program.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号