首页> 美国政府科技报告 >Task Assignment Plan for WSPAR, SEMR, POM, and HQ USAF/LG Logistics AssessmentPrograms
【24h】

Task Assignment Plan for WSPAR, SEMR, POM, and HQ USAF/LG Logistics AssessmentPrograms

机译:WspaR,sEmR,pOm和美国空军HQ / LG物流评估计划的任务分配计划

获取原文

摘要

This Task Assignment Plan will explain how Synergy, Inc. will fulfill therequirement for logistics studies and analysis support to operate a suite of logistics capability assessment models. Synergy will perform both peacetime and wartime logistics assessments in support of the WSPAR and SEMR programs. In addition, Synergy will assist in the transfer of responsibility for the WSPAR and SEMR assessments to the System Program Directors (SPDs). This transfer of responsibility will require at least six WSPAR and SEMR training sessions to ensure each SPD's representatives are knowledgeable of the procedures for operating both the Integrated Logistics Assessment Model in Windows(WlNLAM) and the Sustainment Executive Management Report(SEMR) model. Additionally, Synergy will provide any other logistics assessments required by HQ USAF/LG.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号