首页> 美国政府科技报告 >Geomorphological Analysis of North Fork, Toutle River, Washington: 1980-1984
【24h】

Geomorphological Analysis of North Fork, Toutle River, Washington: 1980-1984

机译:华盛顿州Toutle河North Fork的地貌分析:1980-1984

获取原文

摘要

The 18 May 1980 eruption of Mount St. Helens, emplaced between 3-3.5 billioncubic yards (bcy) of poorly sorted material ranging from silt to boulders, extending from river mile (RM) 25 to RM 38 in the upper North Fork Toutle River drainage. Sediment yields from the debris avalanche were calculated for four water years, 1980-1983. During 1980, the North Fork Toutle River reestablished a main channel from RM's 20 to 27, yielding 15 million cubic yards (mcy). In 1981 the channel network lengthened by head cutting, and the network was further integrated to pond and lake breaches on the debris avalanche. Channel length and width increased with winter storms. Within the channel area, braiding and incision were the major processes which yielded 31.5 mcy of sediment. Channel widening, associated with braiding, incision, and bank failure, was the dominant geomorphic processes. A total of 99.4 mcy of sediment was calculated to have been derived from the debris avalanche between 19 May 1980 and September 1983. Debris, Sediment transport, Debris flow, Volcano, Geomorphology.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号