首页> 美国政府科技报告 >Terrestrial and Ecological Risk Assessment at US Army Aberdeen Proving Ground Quality Assurance Project Plan, Volume I
【24h】

Terrestrial and Ecological Risk Assessment at US Army Aberdeen Proving Ground Quality Assurance Project Plan, Volume I

机译:美国陆军阿伯丁试验地面质量保证项目计划的陆地和生态风险评估,第一卷

获取原文

摘要

U.S. Army Aberdeen Proving Ground (APG) is a National Priorities List installation performing environmental investigations under the auspices of a Federal Facilities Interagency Agreement. Data necessary to evaluate risk to human health and the environment will be collected as part of the Terrestrial and Ecological Risk Assessment. To ensure data quality is maintained, a Quality Assurance Project Plan (QAPjP) was prepared. The Quality Assurance Project Plan (QAPiP) delineates the purpose, policies, Standard Operating Procedures (SOPs), and organization of the QA Program which will be used to establish the integrity of APC project activities. The QAPjP encompasses all environmentally-related measurements, and includes the measurement of chemical, physical, and biological parameters in the environment. The quality assurance system integrates the quality planning, assessment, and improvement efforts of various groups in the organization to provide the independent QA program necessary to establish and maintain an effective system for environmental analyses and related activities. The program encompasses the generation of valid and complete data and its subsequent review, validation, and documentation.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号