首页> 美国政府科技报告 >Operations and Maintenance Manual for Expanded Bioventing System at Former Underground Storage Tank Farm Bolling AFB, Washington, DC
【24h】

Operations and Maintenance Manual for Expanded Bioventing System at Former Underground Storage Tank Farm Bolling AFB, Washington, DC

机译:华盛顿特区地下储罐罐区膨胀生物通风系统操作和维护手册

获取原文

摘要

This document has been prepared by Parsons Engineering-Science, Inc. (Parsons ES) to support the bioventing follow on contract awarded by the Air Force Center for Environmental Excellence. The contract involves the conducting of bioventing pilot tests at Air Force bases across the United States. At most sites, bioventing systems will be installed upon completion of the bioventing pilot tests for the purpose of extended pilot testing. These systems will operate for a one year period to provide further information as to the feasibility of the technology at each site, and to provide remedial action in order to close out the site. This Operations and Maintenance Manual has been created specifically for Bolling AFB's combination injection and extraction bioventing system. Basic maintenance of this system is the responsibility of the base. The manual is to be used by base personnel to guide and assist them in operating and maintaining the blower system. Section 2 of this document describes the blower. Section 3 details the maintenance requirements and provides maintenance schedules. Section 4 describes the system monitoring that is required to forecast system maintenance needs and provide data for the extended pilot test. Blower performance curves and relevant service information are provided in Appendix A, and data collection sheets are provided in Appendix B.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号