首页> 美国政府科技报告 >Joint Cross-Service Group for Undergraduate Pilot Training 1995 Base Realignment and Closure Process
【24h】

Joint Cross-Service Group for Undergraduate Pilot Training 1995 Base Realignment and Closure Process

机译:1995年本科飞行员培训联合跨服务小组基地调整和关闭程序

获取原文

摘要

We are providing this report for your information and use. This report is one in a series of reports that discusses the review of the Joint Cross-Service Groups (JCSGs) for 1995 base realignment and closure (BRAC 95) implementation of the internal control plan for managing the identification of DoD cross-Service opportunities. Six JCSGs implemented the BRAC 95 Steering Group's internal control plan to ensure the accuracy, completeness, and integrity of the information upon which the Secretary of Defense recommendations for realignments and closures to the 1995 Commission on Defense Base Closure and Realignment (the 1995 Commission) are based. The Inspector General, DoD, was directed by the Deputy Secretary of Defense to review the adequacy and implementation of the internal control plan over this process.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号