首页> 美国政府科技报告 >Imaging Smolt Behavior on an Extended-Length Submerged Bar Screen and an Extended-Length Submerged Traveling Screen at The Dallas Dam in 1993
【24h】

Imaging Smolt Behavior on an Extended-Length Submerged Bar Screen and an Extended-Length Submerged Traveling Screen at The Dallas Dam in 1993

机译:1993年达拉斯大坝延伸长度浸没式棒材筛网和超长度浸没式行走筛网的成像污染行为

获取原文

摘要

The U.S. Army Engineer District, Portland, commissioned the Environmental andHydraulics Laboratories, U.S. Army Engineer Waterways Experiment Station (WES), to conduct a study to facilitate the design and operation of fish bypass systems. A comparison of impingement behavior of smolts on extended-length submerged traveling screens and bar screens using underwater video imaging was made at The Dalles Dam. Smolt bypass systems were video imaged using low-light sensitive underwater cameras. These cameras recorded smolt behavior to two porosities and three discharges. Screen design had a significant effect on a number of impingement behavior variables and the standard deviation of water approach angles. The general observation was that the smolts can detect and more successfully avoid the traveling screens, while they are less able to detect the bar screens and are more likely to be imaged on or contacted by the bar screens. The necessary monitoring equipment does not exist, but research and development of such systems is ongoing at WES as apart of this study.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号