首页> 美国政府科技报告 >Customer Involvement in the Design Phase of Construction
【24h】

Customer Involvement in the Design Phase of Construction

机译:客户参与施工设计阶段

获取原文

摘要

The principals and tools of Total Quality Management (TQM) have gradually madetheir way into the construction process as a whole. Various phases of the process, mostly large size projects, have experimented with TQM tools, team building, and customer involvement and have found success. Here, the intention is to present the reasons for this success and discuss how they may be applied to smaller projects which are found at the Public Works level of a Naval Base. (MM).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号