首页> 美国政府科技报告 >Impact of Mission Readiness of Trident On-Board-Repair-Parts Inventory Reductions
【24h】

Impact of Mission Readiness of Trident On-Board-Repair-Parts Inventory Reductions

机译:三叉戟任务准备的影响车载维修 - 零件库存减少

获取原文

摘要

The purpose of this research is to determine the mission readiness impact thatwould result if the allowance levels of Trident HME On-Board-Repair-Parts were reduced by 5%, 10%, 15%, or 20%. The dollar value of the reduced inventories is calculated to estimate the potential cost savings to the Operations and Maintenance, Navy (OMN) appropriation account. The study concludes that reducing Trident HME allownace levels up to 20% would have no impact on mission readiness. At the 20% inventory reduction level, the procurement cost savings to the OMN appropriation for one Trident submarine is estimated to be more than $500,000 per inventory cycle.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号