...
首页> 外文期刊>Photovoltaics International >The next big step - Optimizing the performance of PV power assets
【24h】

The next big step - Optimizing the performance of PV power assets

机译:下一步-优化光伏发电资产的绩效

获取原文
获取原文并翻译 | 示例
           

摘要

To achieve project cash flow expectations, it is necessary to operate, maintain and optimize the performance of a PV power asset to meet or exceed the pro forma operating assumptions. To assume as given the achievement of these model assumptions is both naive and risky. Experience in operating the largest fleet of solar PV power plants in the world has demonstrated that project financial hurdle rates can be missed by as much as 25% if the plant is not well maintained and its performance is not optimized. Conversely, an optimized PV asset can generate cash flows 2-10% higher than expected if the optimization approach described in this paper is implemented.
机译:为了达到项目现金流量的预期,必须运行,维护和优化光伏发电资产的性能,以达到或超过预估运行假设。假设实现了这些模型假设,既幼稚又冒险。操作世界上最大的太阳能光伏电站船队的经验表明,如果电站维护得不好并且性能未得到优化,则项目财务障碍率可能会损失多达25%。相反,如果实施本文所述的优化方法,则优化的PV资产可产生比预期高2-10%的现金流量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号