...
首页> 外文期刊>SA Mechanical Engineer >Opening Doors for Heavy Engineering
【24h】

Opening Doors for Heavy Engineering

机译:重型工程开门

获取原文
获取原文并翻译 | 示例

摘要

A new drill rig platform was recently undergoing final pre delivery trials in Saldanha Bay harbour before delivery to its Brazilian client and final commissioning, when engineers discovered that the hydraulic cylinders and accumulators on the compensators had been damaged by grit that formed due to air getting into the cylinder and forming a fine. Components for the rig were built by several international specialist manufacturers and finally assembled in Abu Dhabi, in a joint venture. This meant the eight thirteen and a half tonne compensators would have to be removed and sent back to France to the original equipment manufacturer for refurbishment and repair prior to commissioning.
机译:最近,一个新的钻机平台在Saldanha湾港口进行了最终交付前的试验,然后交付给巴西客户并进行了最终调试,当时工程师发现补偿器上的液压缸和蓄能器已因空气进入而形成的砂砾损坏了。圆柱体并形成罚款。该钻机的零部件由多家国际专业制造商制造,并最终由一家合资企业在阿布扎比组装。这意味着必须拆除八十三吨半的补偿器,并在调试之前将其送回法国给原始设备制造商进行翻新和维修。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号