首页> 外文期刊>Petroleum Review >First production from Caesar/Tonga project
【24h】

First production from Caesar/Tonga project

机译:凯撒/汤加项目的第一批生产

获取原文
获取原文并翻译 | 示例
       

摘要

Anadarko Petroleum, as operator, has announced first production at the Caesar/Tonga development in the Green Canyon area of the deepwater Gulf of Mexico. Production from Caesar/Tonga, with an estimated resource base of 200mn to 400mn boe, is expected to ramp up to approximately 45,000 boe/d from the first three subsea wells. A fourth development well is expected to be drilled and completed later this year, as part of the planned Phase I development.In addition to utilising Anadarko's 100% operated Constitution spar floating production facility, the Caesar/Tonga development alsoincluded the first application of steel lazy wave riser technology (featuring a series of small buoyancy collars) in the Gulf of Mexico.
机译:阿纳达科石油公司(Anadarko Petroleum)已宣布,将在墨西哥深水湾墨西哥湾绿色峡谷地区的凯撒(Caesar)/汤加(Tonga)开发项目中首批生产。凯撒/汤加的储量估计为2亿至4亿桶油当量,预计前三座海底井的产量将提高至约45,000桶油当量/天。作为计划的第一阶段开发的一部分,预计将在今年晚些时候钻探并完成第四口开发井。除了利用阿纳达科的100%运营的长方体浮法生产设备外,凯撒/汤加的开发还包括首次使用惰性钢墨西哥湾的Wave Riser技术(具有一系列小的浮力衣领)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号