Construction firm Stroitransgaz has won a tender to build the 541km Bul-garian section of the planned South Stream gas pipeline,after bidding with Bulgaria’s Gasproekt.It will build three compressor stations with a com-bined capacity of 300MW.The Bulgar-ian section should be ready by the end of 2015 to ship first gas to Bulgaria in early 2016.
展开▼