The largest phase of Iran’s South Pars natural gas field, the 2.8bn ft~3/d (28.8bn m~3/yr) phase 12, is fully operational after starting up in March (WPA, 20 March, p3). Iranian gas output will rise further when phases 15 and 16 start producing a combined 1.7bn ft~3/d by October.
展开▼