首页> 外文期刊>Petroleum Argus >Statoil trips under Norwegian workload
【24h】

Statoil trips under Norwegian workload

机译:挪威工作量下的挪威国家石油之旅

获取原文
获取原文并翻译 | 示例
           

摘要

Norway’s state-controlled Statoil aims to get its flagship 1.8bn-2.9bn bl of oil equivalent (boe) Johan Sverdrup project back on track, as the firm grapples with daunting development challenges on its home turf. Statoil delayed finalising a development concept for Johan Sverdrup last month with partners state-controlled Petoro, Norwegian independent Det Norske, Swedish independent Lundin Petroleum and Denmark’s Maersk Oil (WPA, 20 December, p9). The companies face political pressure in Norway to use onshore renewable sources to power offshore fields, but the smaller partners are resisting, citing the longer timeline for developing such facilities and the knock-on effect on capital costs.
机译:挪威国家控制的挪威国家石油公司(Statoil)计划恢复其旗舰项目18亿至29亿桶(石油当量)约翰·斯维尔德鲁普(Johan Sverdrup)项目的步伐,因为该公司正努力应对其本国领土面临的艰巨发展挑战。挪威国家石油公司(Statoil)上个月推迟了与合作伙伴国家控制的Petoro,挪威独立的Det Norske,瑞典独立的伦丁石油公司和丹麦的马士基石油公司(Mask Oil)最终敲定Johan Sverdrup的开发计划(WPA,12月20日,第9页)。两家公司在挪威面临使用陆上可再生资源为海上油田供电的政治压力,但较小的合作伙伴对此表示抗拒,理由是开发此类设施的时间较长且对资本成本产生连锁反应。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号