...
首页> 外文期刊>Petroleum Argus >Kazakhstan’s Tengiz field expansion costs rising
【24h】

Kazakhstan’s Tengiz field expansion costs rising

机译:哈萨克斯坦的腾吉兹油田扩张成本上升

获取原文
获取原文并翻译 | 示例
           

摘要

The cost of raising crude output at Kazakhstan’s huge Tengiz field could double previous estimates. Higher costs for Tengiz’s future growth project are detailed in a revised plan presented to the government by the Chevron-led Tengizchevroil (TCO) consortium, energy minister Vladimir Shkolnik says. “It was originally expected to cost $23bn, but now - due to certain circumstances - our partners have presented to us a sum that is much bigger, around $40bn,” Shkolnik says. Chevron is field operator at Tengiz.
机译:哈萨克斯坦庞大的腾吉兹油田提高原油产量的成本可能是先前估计的两倍。能源部长弗拉基米尔·史考尼克(Vladimir Shkolnik)说,雪佛龙领导的Tengizchevroil(TCO)财团向政府提交的修订计划中详细说明了Tengiz未来增长项目的更高成本。 Shkolnik说:“最初预计将耗资230亿美元,但由于某些情况,现在我们的合作伙伴向我们提供的金额要大得多,约为400亿美元。”雪佛龙公司是​​Tengiz的现场运营商。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号