In most fluting and linerboard production,the key challenges are to achieve the required dry strength,to minimize retention (drainage)chemicals costs and to maximize machine speed.Online measurements and closed loop wet end chemical controls contribute to meet these challenges.This feature gives a resume how a step-by-step improvement based on online equipment can be achieved.A "particular eye"is kept on drainage and how to control it.
展开▼