...
首页> 外文期刊>PACE - process & control engineering >AGL Loy Yang Integrated Control and Monitoring System Upgrade (ICMS) Unit 1 and 2
【24h】

AGL Loy Yang Integrated Control and Monitoring System Upgrade (ICMS) Unit 1 and 2

机译:AGL Loy Yang集成控制和监视系统升级(ICMS)单元1和2

获取原文
获取原文并翻译 | 示例

摘要

The project involved the replacement of AGL Loy Yang's Instrumentation and Control Systems to the Yokogawa's Distributed Control Systems CS3000, Centum VP and the Safety System, Prosafe. The project involved upgrading the instrumentation and control systems of two turbine/generator units. The transitions of both units were performed during AGL Loy Yang's Major Outage maintenance periods. With the maintenance outages having a defined period off line, the companies completed the control system upgrades within the set time period, and met all milestones and contractual obligations.
机译:该项目涉及将AGL Loy Yang的仪表和控制系统替换为横河电机的Centum VP分布式控制系统CS3000和Prosafe安全系统。该项目涉及升级两个涡轮机/发电机组的仪表和控制系统。在AGL Loy Yang的主要停运维护期间执行了这两个单元的过渡。由于维护中断具有规定的离线时间,因此公司在规定的时间内完成了控制系统的升级,并履行了所有里程碑和合同义务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号