首页> 外文期刊>Steel Construction Today & Tomorrow >Steel-Concrete Composite Bridges in High-speed Railways--Matsubara Bridge: Erection under Severe Conditions
【24h】

Steel-Concrete Composite Bridges in High-speed Railways--Matsubara Bridge: Erection under Severe Conditions

机译:高速铁路钢混凝土组合桥-松原大桥:恶劣条件下的架设

获取原文
获取原文并翻译 | 示例
           

摘要

As mentioned above, construction of the Shinkansen lines in Japan has been in progress on a sustained base. An outline of Shinkansen projects is shown in Fig.l (a). The red lines in the figure show the recent construction of Shinkansen. The extension of the Tohoku Shinkansen to the northern part of Japan was completed in December 2010, and that of the Kyushu Shinkansen to the southern part of Japan is slated in March 2011. The inauguration of these new lines means that all regions from the northern area of Honshu to the southern area of Kyushu will be connected by highspeed railways, and thus the mobility is expected to significantly increase throughout Japan (note: Hokkaido Island will be connected by Shinkansen in 2015).
机译:如上所述,日本的新干线正在持续建设中。新干线项目的概述如图1(a)所示。图中的红线表示新干线的最新构造。东北新干线至日本北部的扩建工程已于2010年12月完成,九州新干线至日本南部的扩建工程将于2011年3月完成。这些新线路的落成意味着北部地区的所有地区本州至九州南部地区的铁路将通过高速铁路连接,因此,预计整个日本的交通将大大增加(注:北海道岛将于2015年由新干线连接)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号