...
首页> 外文期刊>Steel Construction Today & Tomorrow >Sui-sui MOP Method--Rapid Construction Technology for Grate Separation
【24h】

Sui-sui MOP Method--Rapid Construction Technology for Grate Separation

机译:穗穗MOP法-炉排分离快速施工技术

获取原文
获取原文并翻译 | 示例
           

摘要

The grade-separation overhead bridge by means of the Sui-sui MOP (module on pier) method (temporarily abbreviated as the "MOP method") is composed of the bridge section consisting of steel bridge girders and piers and the approach section consisting of banking. Features of the MOP method include relief from traffic congestion during installation work and, further, a reduction of the construction term by making full use of "module girders," a technology for downsizing bridge girders. (Refer to Figs. 1-3)
机译:通过Sui-sui MOP(墩上模块)方法(临时缩写为“ MOP方法”)的坡度分离式高架桥由钢桥大梁和桥墩组成的桥段和由堤岸组成的引桥段组成。 MOP方法的特点包括减轻安装工作期间的交通拥堵,并且还通过充分利用“模块式梁”(一种减小桥梁梁尺寸的技术)来减少施工工期。 (参考图1-3)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号