Manufacture and Installation of Steel Structures for New D-Runway

机译:新型D形跑道钢结构的制造和安装

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The re-expansion project for Tokyo International Airport (Haneda Airport) includes a 1,100-m long island for the D-Runway located at the mouth of the Tama River. Because of this, the island had to be constructed in a manner that would not impede water flow in the area. Additionally, several challenging requirements were imposed on the island's construction work: to reduce the number of steel pipe piles to be driven, to shorten the construction term by means of member prefabrication, and to abide by restrictions placed on construction work due to flight operations at the existing airport. To this end, a jacket-type pier structure was adopted for construction of the 1,100-m long island. The following discusses the manufacture and installation of the jackets, the steel pipe pile loading tests, the construction of the connection taxiway, and the area that connects the reclaimed area and pier section.
机译:东京国际机场(羽田机场)的扩建项目包括位于多摩河河口的一条1,100米长的D跑道岛。因此,必须以不妨碍该地区水流的方式建造岛屿。此外,对岛上的建筑工作提出了一些具有挑战性的要求:减少要打入的钢管桩的数量,通过构件预制的方式缩短建造工期,并遵守由于飞行操作而对建筑工作施加的限制。现有的机场。为此,在1,100米长的岛上采用了夹套式码头结构。下面讨论外套的制造和安装,钢管桩的载荷测试,连接滑行道的建设以及连接填海区和码头段的区域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号