首页> 外文期刊>Steel & Metallurgy >Shougang Jingtang, China: PL-TCM in operation ahead of schedule
【24h】

Shougang Jingtang, China: PL-TCM in operation ahead of schedule

机译:中国首钢京唐:PL-TCM提前投入运营

获取原文
获取原文并翻译 | 示例
       

摘要

The new PL-TCM was erected under SMS Siemag's leadership on Caofeidian island off the coast of China's Hebei province. The customer is Shougang Jingtang United Iron & Steel, a joint venture of Shougang Iron & Steel" and Tangshan Iron & Steel. The new mill makes it possible for Shougang Jingtang to produce strips of high-quality steel grades which are mainly intended for the carmaking industry. The PL-TCM is part of a new metallurgical complex for which company also supplied a hot strip mill and two annealing lines for further processing of the cold strips. And just recently a further order has come in covering an annealing line for tin plate.
机译:在SMS Siemag的领导下,新的PL-TCM在中国河北省沿海的曹妃甸岛上架起。客户是首钢京唐联合钢铁有限公司,这是首钢京唐和唐山钢铁的合资企业。新厂使首钢京唐能够生产主要用于汽车制造的高品质钢带PL-TCM是新冶金厂的一部分,该公司还为其提供了热轧机和两条退火线以进一步加工冷轧带钢,而最近又又有一项订单涵盖了镀锡退火线。 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号