首页> 外文期刊>Sulzer Technical Review >Upgrading a power station for improved efficiency: Hydro-generator refurbishment
【24h】

Upgrading a power station for improved efficiency: Hydro-generator refurbishment

机译:升级电站以提高效率:水轮发电机翻新

获取原文
获取原文并翻译 | 示例
           

摘要

Since 1882, when one of the first AC hydroelectric power stations was built with a capacity of 12.5kW, the number of stations has grown very significantly not only in number but also in capacity Today, for example, the Three Gorges power station has a capacity of 22 500MW. Many power stations were built in the first half of the 20th century, and several stations have been in operation for over 100 years. Although the dams are relatively unchanged, the efficiency improvements in turbines have resulted in increased shaft power and, therefore, increased generation output.
机译:自1882年以来,第一座容量为12.5kW的交流水力发电站建成以来,水电站的数量不仅在数量上而且在容量上都已大大增加。例如,今天,三峡水电站已具备22 500兆瓦。在20世纪上半叶建造了许多电站,并且有几座电站已经运行了100多年。尽管水坝相对不变,但涡轮机效率的提高导致轴功率增加,因此发电量增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号