首页> 外文期刊>Structure and Infrastructure Engineering >Bridge information models for construction of a concrete box-girder bridge
【24h】

Bridge information models for construction of a concrete box-girder bridge

机译:混凝土箱梁桥的桥梁信息模型

获取原文
获取原文并翻译 | 示例
           

摘要

Large construction projects involve collaboration among a large number of participants with different specialised knowledge from various construction processes. A readily accessible bridge information model is needed to enable engineers to innovate prefabricated bridge construction. Three-dimensional (3D) information models can include multi-layered information for different users such as designer, contractor and owner. A construction project lifecycle management system was suggested to integrate and to accumulate valuable information. In this paper, 3D bridge information models for an international concrete bridge construction project were built to integrate design and construction processes. The 3D bridge models were realised by considering work breakdown structure and product breakdown structure to enable digital mock-up and design enhancement and to shorten the learning time of construction engineers. The models were also utilised for the fabrication of precast box segments and for the geometry control during construction. Assessment from the construction director was discussed and additional usage of the bridge information models was suggested.
机译:大型建设项目涉及大量参与者之间的协作,这些参与者具有来自不同建设过程的不同专业知识。需要一个易于访问的桥梁信息模型,以使工程师能够创新预制桥梁的结构。三维(3D)信息模型可以包含针对不同用户(例如设计师,承包商和所有者)的多层信息。建议建设项目生命周期管理系统来集成和积累有价值的信息。本文构建了国际混凝土桥梁建设项目的3D桥梁信息模型,以集成设计和施工过程。通过考虑工作分解结构和产品分解结构来实现3D桥梁模型,以实现数字化模型和设计增强,并缩短建筑工程师的学习时间。该模型还用于预制箱体段的制造以及施工期间的几何形状控制。讨论了施工主管的评估,并提出了桥梁信息模型的其他用法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号