...
首页> 外文期刊>SPECIFIER/The Monthly Information Update for AEC Professionals >CLF lays first jointless DM 1 floor for South Africa's highest racking warehouse
【24h】

CLF lays first jointless DM 1 floor for South Africa's highest racking warehouse

机译:CLF为南非最高的货架仓库铺设了第一层无缝DM 1地板

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Concrete Laser Flooring (CLF) has been appointed, by construction company Archstone to lay South Africa's first defined movement (DM) 1 floor at national . pharmaceutical group Dischem's.new 20 000m-distribution centre, in Midrand. CLF director Peter Norton explains that a 6 000m section of the total floor area will be placed to DM1 category specifications due to the height of the racking on site, which at over 20m is the highest in the country.
机译:建筑公司Archstone指定了混凝土激光地板(CLF),以在南非全国铺设第一个活动地板(DM)1地板。制药集团Dischem在米德兰的新的20万米配送中心。 CLF主管彼得·诺顿(Peter Norton)解释说,由于现场机架的高度,该建筑总面积的6000万部分将被放置在DM1类别规范中,该高度超过了全国最大的20m。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号