首页> 外文期刊>Steel in Translation >Vacuum Treatment of Steel in a Two-Position Unit in the Oxygen-Converter Shop
【24h】

Vacuum Treatment of Steel in a Two-Position Unit in the Oxygen-Converter Shop

机译:氧气转炉车间两工位钢的真空处理

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Degassing and deep decarburization of steel in a two-position vacuum-treatment unit in the oxygen-converter shop at OAO Magnitogorskii Metallurgicheskii Kombinat is described. That unit went into operation in February 2010. To fulfill orders for pipe steel with specified hydrogen content (no more than 3 ppm in the final steel) and nitrogen content (no more than 0.006%), the minimum vacuum-degassing time is determined, the influence of additions of slag-forming materials and ferroalloys after vacuum degassing on the hydrogen content in the steel is assessed, and the potential of the new vacuum-treatment unit for deep decarburization of steel in natural and forced conditions is demonstrated.
机译:描述了在OAO Magnitogorskii Metallurgicheskii Kombinat的氧气转炉车间的两工位真空处理装置中对钢进行的脱气和深度脱碳。该装置于2010年2月投入运行。为了满足具有指定氢含量(最终钢中不超过3 ppm)和氮含量(不超过0.006%)的钢管的订单,确定了最小脱气时间,评估了真空脱气后形成炉渣的材料和铁合金对钢中氢含量的影响,并证明了新型真空处理装置在自然和强制条件下对钢进行深度脱碳的潜力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号