首页> 外文期刊>Steel Times >Control of the new walking beam furnace at BS Scunthorpe
【24h】

Control of the new walking beam furnace at BS Scunthorpe

机译:BS Scunthorpe的新型步进梁式炉的控制

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Kvaerner Davy, which is installing a walking beam reheat furnace for the British Steel Scunthorpe Heavy Section Mill, subcontracted the plant's process control and electrics to Ansaldo UK. The system to be supplied is designed to work in either automatic or manual modes and interfaces with the Davy on-line modelling system for calculation of setpoints and furnace residence times. British Steel's Heavy Section Mill at Scunthorpe currently takes its feed stock from hot ingots which are re heated to rolling temperature in soaking pits. The soaking pits - which have been in operation for a number of years - now require refurbishing and their fuel efficiencies are below current day expectations. Operational changes are thus being made which will allow the mill feed stock to be taken from cold concast slabs. These changes require a new furnace arrangement to re-heat the slabs to the correct rolling temperature.
机译:克瓦纳·戴维(Kvaerner Davy)正在为英国斯肯索普重型钢厂安装步进梁式再热炉,并将该工厂的过程控制和电力分包给了英国的安萨尔多。所提供的系统设计为可在自动或手动模式下工作,并与Davy在线建模系统进行接口,以计算设定值和炉子停留时间。英国钢铁公司位于斯肯索普的重型钢厂目前从热锭中提取原料,然后将其在均热炉中加热至轧制温度。浸没坑-已经运行了很多年-现在需要翻新,其燃油效率低于当今的预期。因此正在进行操作上的改变,这将允许从冷连铸坯中提取轧机的原料。这些变化需要新的熔炉布置,以将板坯重新加热到正确的轧制温度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号