首页> 外文期刊>Modern Steel Construction >Real-life Adventures in Staggered Truss Framing
【24h】

Real-life Adventures in Staggered Truss Framing

机译:交错桁架中的现实冒险

获取原文
获取原文并翻译 | 示例
           

摘要

Project engineer Rod Gervais shares his experience constructing a staggered truss project with AISC Regional Engineer Tom Faraone. What makes the staggered truss system a success? Is it the direct dollar savings? The faster project-completion time? Is it the more-functional end product? The Marriott Hotel and Spa, in Mystic, CT is a six-story, 285-room, staggered-truss-framed building, completed in June 2001. An key to the success of this project was the hands-on involvement of Rod Gervais, project engineer for Wolman Construction, and the owner/developer/operator/general contractor for the Mystic Marriott project.
机译:项目工程师Rod Gervais与AISC区域工程师Tom Faraone分享了他构建交错桁架项目的经验。是什么使交错桁架系统成功?是直接的美元储蓄吗?项目完成时间更快?它是功能更强大的最终产品吗?康涅狄格州米斯蒂克市的万豪酒店及水疗中心是一栋六层高,有285个房间的交错桁架式建筑,于2001年6月竣工。该项目成功的关键在于Rod Gervais的亲身参与, Wolman Construction的项目工程师,以及Mystic Marriott项目的所有者/开发人员/运营商/总承包商。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号