首页> 外文期刊>Southwest Contractor >Presbyterian Pumps Up/Albuquerque Hospital Adds Floors, More Space
【24h】

Presbyterian Pumps Up/Albuquerque Hospital Adds Floors, More Space

机译:长老会不断增加/阿尔伯克基医院增加地板,更多空间

获取原文
获取原文并翻译 | 示例
       

摘要

"Quiet, please," was a bit harder for Bill Schuttler to obey than for the ordinary visitor to a hospital. Schuttler is the overall project manager on the 55 million dollars construction and renovation job for Albuquerque's Presbyterian Hospital, the largest acute-care hospital in New Mexico. The work, a joint venture for the Southwest and Midwest divisions of McCarthy Construction, includes a three-story addition of 150,000 sq. ft. and 25,000 sq. ft. of renovation. It required coordinating the services of 12 subcontractors. The hospital is on Central Avenue, just east of Interstate 25. As Schuttler's crews drilled 75-ft.-deep auger-cast piles inside the existing facility to support additions that would rise above it, they had to work around a continual influx of patients and not disturb vibration-sensitive equipment such as CT scanners and MRI.
机译:比尔·舒特勒(Bill Schuttler)服从的“安静”,要比普通的住院者要难一些。舒特勒是阿尔伯克基长老会医院(新墨西哥州最大的急诊医院)的5500万美元建筑和装修工作的整体项目经理。该工程是麦卡锡建设西南和中西部部门的合资企业,包括三层楼高150,000平方英尺和25,000平方英尺的翻新工程。它需要协调12个分包商的服务。该医院位于25号州际公路以东的中央大街上。由于舒特勒的工作人员在现有设施内钻了75英尺深的螺旋钻桩,以支撑可能会超过其的附加设施,因此他们不得不围绕不断涌入的患者而努力且请勿干扰CT扫描仪和MRI等对振动敏感的设备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号