...
首页> 外文期刊>Modern Steel Construction >Adapting Traditional Plans to Fit a Tight Site
【24h】

Adapting Traditional Plans to Fit a Tight Site

机译:调整传统计划以适应狭窄的场地

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Church of Jesus Christ of Latter-day Saints (LDS) is building a new Ward and Stake Meeting House in East Cambridge, Mass., just north of downtown Boston. Normally, a wood-framed structure, the current construction incorporates steel in order to support several significant design modifications. As an international organization, the Church of Jesus Christ of Latter-Day Saints uses a prototypical program and appearance for its Meeting Houses. The building program includes a large chapel, a small chapel, a multi-purpose recreation hall, classrooms, and offices. The typical Meeting House is a single-story structure with a gable roof, large steeple, and usually is constructed in rural and suburban settings where parking is provided on-site adjacent to the building. The new Meeting House for East Cambridge is located on a tight site (150 ft by 200 ft) in an urban, light industrial area of greater Boston, and is required to provide the program and parking within the site footprint. To achieve this, the typical Meeting House layout required significant modification.
机译:耶稣基督后期圣徒教会(LDS)在波士顿市中心以北的马萨诸塞州东剑桥市建立了一个新的病房和权益会议厅。通常,木结构结构,当前的建筑采用钢,以支持一些重大的设计修改。作为一个国际组织,耶稣基督后期圣徒教会在其会议室中使用原型制作程序和外观。建筑计划包括一个大教堂,一个小教堂,一个多功能休闲厅,教室和办公室。典型的会议室是一个单层结构,带有山墙屋顶,大尖顶,通常在农村和郊区建造,在建筑物附近设有现场停车位。新的东剑桥会议厅位于波士顿大都市轻工业区的一个狭窄场地(150英尺乘200英尺)内,并且需要在场地范围内提供计划和停车位。为此,需要对典型的会议室布局进行重大修改。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号