...
首页> 外文期刊>Southwest Contractor >FDR Becomes Foundation for Holidaf Season
【24h】

FDR Becomes Foundation for Holidaf Season

机译:FDR成为假期的基础

获取原文
获取原文并翻译 | 示例
           

摘要

Full-depth reclamation (FDR) with portland cement was the clear choice in the recent rehabilitation of a 15,000 yd~2 parking area at the Hanes Mall of Winston Salem, N.C. In need of a facelift, the parking area of JCPenney underwent a transformation just in time for the winter holiday season. The parking area, consisting of severely cracked and oxidized asphalt surfacing, was in desperate need of repair. A regional office of Professional Service Industries, Inc. (PSI) located in Charlotte, N.C. decided to include FDR in the contract bid as an alternate to the traditional "remove and replace" base reconstruction of the JCPenney parking area. A 2-inch asphalt surface course would provide the riding sur- face.
机译:在最近对北卡罗来纳州温斯顿塞勒姆的汉斯购物中心的15,000 yd〜2停车区进行修复时,采用波特兰水泥进行全深度填海(FDR)是明显的选择。JCPenney的停车区进行了改造,及时赶上冬季假期。急需维修的停车场,包括严重破裂和氧化的沥青路面。位于北卡罗来纳州夏洛特市的专业服务工业公司(PSI)的地区办事处决定将FDR包括在合同投标中,以替代JCPenney停车区的传统“拆除和更换”基地重建。 2英寸的沥青路面可以提供骑乘表面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号