...
【24h】

Project Profiles

机译:项目简介

获取原文
获取原文并翻译 | 示例
           

摘要

In March 2005, Graef subcontracted with CORE Construction Services of Arizona for the Apache Junction City Facilities, 1001 N. Idaho Road, The 582,776 dollars contract called for Graef to complete grading, paving and excavate for site utilities. The project was completed in November 2005.The 78,000-square-foot project consisted of two separate facilities. The city hall/courts portion includes courtrooms, office space, meeting space, a temporary holding cell and other amenities. The multi-generational portion of the project included an indoor running track and other city facilities. Jay Graef notes: "During construction, we had to pay particular attention to maintaining the pristine descrl and coordinating wilh the city's activities and services."
机译:2005年3月,Graef与亚利桑那州的CORE建筑服务公司分包了爱达荷州北路1001号的Apache Junction City市设施,该合同价值582,776美元,要求Graef完成场地公用设施的平整,摊铺和挖掘工作。该项目于2005年11月完成。占地78,000平方英尺的项目由两个独立的设施组成。市政厅/法院部分包括审判室,办公空间,会议空间,临时牢房和其他便利设施。该项目的多代项目包括室内跑道和其他城市设施。杰伊·格雷夫(Jay Graef)指出:“在建筑过程中,我们必须特别注意保持原始的装饰并协调城市的活动和服务。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号