首页> 外文期刊>Southwest Contractor >LEED Gold in Nevada
【24h】

LEED Gold in Nevada

机译:内华达州LEED金奖

获取原文
获取原文并翻译 | 示例
       

摘要

The Patagonia Distribution Center located in Reno is the first LEED Gold project in the state of Nevada and the first LEED project of any kind outside Clark County. The project attempted 44 points and was awarded an astonishing 43 points to achieve the Gold rating. A combination of strategic planning and working with multiple LEED synergies helped achieve this level. A majority of the team members had never worked on a LEED project before, so it was a learning experience for everybody. The vision for the project ranged from basic green building principles to the minute details of each credit and strategy. The team held weekly meetings throughout the process to keep everybody on board with LEED details and to make-sure not a single mistake was made. The project is an expansion of an existing Patagonia building and includes retail, offices and a warehouse facility. The existing building uses the Night Flush Vent System and the same was designed for the new facility. It takes advantage of low night-time temperatures of the Northern Nevada desert environment to cool the warehouse in the summer. Hence, no mechanical cooling units are used in the warehouse.
机译:位于里诺的巴塔哥尼亚配送中心是内华达州的第一个LEED黄金项目,也是克拉克县以外的第一个LEED项目。该项目尝试获得44分,并获得了惊人的43分,获得了金牌评级。战略计划的结合以及与多个LEED的协同作用共同帮助达到了这一水平。大多数团队成员以前从未从事过LEED项目,因此这对每个人都是一次学习经历。该项目的愿景范围从基本的绿色建筑原则到每个信用和策略的详细细节。在整个过程中,团队每周举行一次会议,以使每个人都了解LEED的详细信息,并确保没有犯一个单一的错误。该项目是对现有Patagonia建筑物的扩展,包括零售,办公室和仓库设施。现有建筑使用Night Flush Vent System,并且是为新设施设计的。它利用内华达州北部沙漠环境的夜间低温来在夏天为仓库降温。因此,仓库中不使用机械冷却装置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号