首页> 外文期刊>Southwest Contractor >Echelon & Summerlin Centre Delayed, Cosmo Foreclosed, Jean Cancelled
【24h】

Echelon & Summerlin Centre Delayed, Cosmo Foreclosed, Jean Cancelled

机译:梯队和萨默林中心延迟,Cosmo取消抵押品赎回权,让取消了

获取原文
获取原文并翻译 | 示例
       

摘要

Las Vegas likes to think big, but many of its big building plans are being tested by fewer visitors, declining gaming revenues and tightened credit availability. As a result, several high profile projects including the 4.8 billion dollion Echelon have been delayed or cancelled. On Aug. I, Boyd Gaming Corp. halted construction on its 5,000-room Echelon mega-resort citing "weak economic conditions" and "the difficult environment in today's capital markets." The Las Vegas-based firm will delay work at least a year, placing 800 tradesmen immediately out-of-work. The move sent Boyd stock skyrocketing by 32 percent for its steepest gain since April 2000.
机译:拉斯维加斯喜欢高瞻远瞩,但许多大型建筑计划正受到较少游客的考验,游戏收入下降,信贷供应收紧。结果,包括48亿美元的梯队的几个备受瞩目的项目被推迟或取消。 8月1日,博伊德博彩公司(Boyd Gaming Corp.)援引“疲弱的经济状况”和“当今资本市场的艰难环境”,中止了其拥有5,000个房间的梯队大型度假胜地的建设。这家位于拉斯维加斯的公司将把工作推迟至少一年,使800名商人立即失业。此举使博伊德股价飙升了32%,是自2000年4月以来的最大涨幅。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号