首页> 外文期刊>Southwest Contractor >Hyper-Fast Hospital Banner Gilbert Gatewa Gets on the Fast Track
【24h】

Hyper-Fast Hospital Banner Gilbert Gatewa Gets on the Fast Track

机译:超快医院的旗帜Gilbert Gateway步入快速通道

获取原文
获取原文并翻译 | 示例
           

摘要

The Southwest Region office of St. Louis-based contractor McCarthy Building Companies is completing work on the 360,000-sq-ft Banner Gateway Medical Center in Gilbert. The 189 million dollars campus is being developed by Phoenix-based Banner Health and is scheduled to open in the fall on 60 acres at U.S. Highway 60 and Higley Road. It will include a five-story inpatient bed tower, three-level diagnostic and treatment building, helipad and medical office building. "Banner Gateway Medical Center will be a technologically advanced hospital within a healing environment, all designed to transform the patient-care experience."
机译:总部位于圣路易斯的承包商麦卡锡建筑公司(McCarthy Building Companies)的西南地区办公室正在吉尔伯特(Gilbert)占地360,000平方英尺的Banner Gateway医疗中心完成工作。该校园耗资1.89亿美元,由总部位于美国凤凰城的Banner Health开发,计划于秋天开放,占地60英亩,位于美国60号高速公路和Higley Road。它将包括一个五层的住院床塔,三层的诊断和治疗大楼,直升机停机坪和医疗办公大楼。 “ Banner Gateway医疗中心将在康复环境中成为技术先进的医院,所有这些医院都旨在改变患者的护理体验。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号