首页> 外文期刊>Southwest Contractor >River Roadway/Arizona's Hoover Dam Bridge Approach Hums Along
【24h】

River Roadway/Arizona's Hoover Dam Bridge Approach Hums Along

机译:沿河巷道/亚利桑那州的胡佛水坝大桥驶向嗡嗡声

获取原文
获取原文并翻译 | 示例
       

摘要

Activity is humming along on Arizona's roadway approach to the Hoover Dam Bypass Bridge, an alternate crossing over the Colorado River that is expected to greatly relieve traffic over the dam"s existing two-lane highway, which sees more than 13,000 vehicles a day. The U.S. Highway -93 route is a major commercial corridor identified in the North America Free Trade Agreement route between Mexico and Canada. But since the terrorist attacks of Sept. n, truck traffic over the dam has been rerouted 23 mi. away, costing the industry an estimated 30 million dollars annually. The Federal Highway Administration is awarding projects to fast-track bridge construction. In February 2003, a joint- venture of two Arizona firms, R.E. Monks Construction Inc., of Fountain Hills and Vastco Inc. of Chino Valley, landed the 21.4 million dollars Arizona approach.
机译:在亚利桑那州通往胡佛水坝旁路桥的道路上,交通活动正在嗡嗡作响,胡佛水坝旁路桥横跨科罗拉多河,预计将大大缓解该水坝现有的两车道高速公路上的交通,该高速公路每天有超过13,000辆车。美国高速公路-93号公路是墨西哥和加拿大之间在北美自由贸易协定中确定的一条主要商业走廊,但自9月n日发生恐怖袭击以来,大坝上的卡车运输已被改道至23英里以外,这使该行业蒙受了损失。美国联邦公路管理局(Federal Highway Administration)授予快速通道桥梁建设项目的资金估计为2003年2月,这是亚利桑那州两家公司的合资企业,分别是喷泉山的RE Monks Construction Inc.和奇诺瓦利的Vastco Inc.。 ,着陆了2140万美元的亚利桑那号方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号