首页> 外文期刊>Southwest Contractor >School Work Remains Steady in Arizona
【24h】

School Work Remains Steady in Arizona

机译:学校工作在亚利桑那州保持稳定

获取原文
获取原文并翻译 | 示例
       

摘要

A joint venture between Phoenix-based Sundt Construction and Stacy & Witbeck, an Alameda, Calif, company, recently won the 57.5 million dollars contract for the construction of a light rail and storage facility for valley Metro's light rail project. The project is the largest single component of the new light rail system, which has a budget of 1.3 billion dollars. Construction of the maintenance and storage facility is expected to begin this fall. The 35-acre facility will be located near the junction of Highway 143 (Hohokam Freeway) and Loop 202 (Red Mountain Freeway) in east Phoenix and will initially house up to 40 light rail vehicles.
机译:总部位于凤凰城的Sundt Construction与位于加利福尼亚阿拉米达的Stacy&Witbeck的合资企业最近赢得了5750万美元的合同,该合同为Valley Metro的轻轨项目建设轻轨和仓储设施。该项目是新轻轨系统最大的组成部分,预算为13亿美元。维护和存储设施的建设预计将于今年秋天开始。这个占地35英亩的设施将位于凤凰城东部的143号高速公路(霍霍坎高速公路)和202号环路(红山高速公路)的交界处附近,最初将容纳40辆轻轨车辆。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号