首页> 外文期刊>Southwest Contractor >UNM Commences Building of New School of Architecture
【24h】

UNM Commences Building of New School of Architecture

机译:联合国大学开始建设新的建筑学院

获取原文
获取原文并翻译 | 示例
       

摘要

Construction began on the new George Pearl School of Architecture & Planning and Fine Arts and Design Library. The general contractor of the University of New Mexico project is Jaynes Corporation. Phase one of the 28.7 million dollars project will take approximately six months with site preparation, utility hook up and disconnects, moving existing utilities and preparing the foundation. Phase two will last around 16 months and will involve construction of the four-level, 108,000-sq,-ft. building, with an estimated completion date in September 2007.
机译:新的乔治·珍珠建筑与规划学院和美术与设计图书馆的建设开始了。新墨西哥大学项目的总承包商是Jaynes Corporation。这个耗资2870万美元的项目的第一阶段将花费大约六个月的时间进行场地准备,公用事业连接和断开,移动现有公用事业并为基础做准备。第二阶段将持续约16个月,将涉及108,000平方英尺的四层建筑。大楼,预计完工日期为2007年9月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号