首页> 外文期刊>Southwest Contractor >Build-Out Begins on Shadow Lane Biomedical Facility
【24h】

Build-Out Begins on Shadow Lane Biomedical Facility

机译:影子巷生物医学设施开始扩建

获取原文
获取原文并翻译 | 示例
           

摘要

McCarthy Building Cos. began construction on the interior build-out of the Shadow Lane Biomedical Facility for the University of Nevada, Las Vegas. The interior build-out phase, designed by SmithGroup Inc. of Phoenix, includes modifying 31,200 sq ft of existing shell space into medical classrooms, laboratories, hospital simulation spaces, offices and study rooms. McCarthy is also installing new mechanical, electrical and plumbing systems as well as relocating an existing chiller and other mechanical equipment. Scheduled for completion in July 2009, the Shadow Lane Biomedical Facility was originally a state-owned rehabilitation center that UNLV acquired to assist in accommodating future growth within the university's nursing and dental medicine schools. The project was divided into multiple phases to allow the university to continue utilizing the facility throughout construction.
机译:McCarthy Building Cos。开始为拉斯维加斯内华达大学的Shadow Lane生物医学设施进行内部扩建。内部扩建阶段由凤凰城的SmithGroup Inc.设计,包括将31,200平方英尺的现有外壳空间修改为医疗教室,实验室,医院模拟空间,办公室和自修室。麦卡锡还将安装新的机械,电气和管道系统,并重新安置现有的冷却器和其他机械设备。影子巷生物医学设施计划于2009年7月竣工,最初是UNLV收购的一家国有康复中心,以帮助适应大学护理和牙科医学院的未来发展。该项目分为多个阶段,以允许大学在整个建设过程中继续利用该设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号