...
首页> 外文期刊>Southwest Contractor >Below the Radar/McCarran Takes Terminal 3 Preparations Underground
【24h】

Below the Radar/McCarran Takes Terminal 3 Preparations Underground

机译:在雷达/麦卡伦下方进行3号航站楼地下准备工作

获取原文
获取原文并翻译 | 示例
           

摘要

McCarran International Airport in Las Vegas is taxiing for construction take-off of a new 1.8-billion dollars third terminal building, and St. Louis, Mo.-based McCarthy Building Cos. is performing 153.7 million dollars in critical civil site improvements to prepare for it. Work on the improvements began a year ago. The project, designed by architect PGAL of Houston, is spread across a 70-acre area along the former Russell Road, which was realigned last year northward between Paradise Road and Spencer Street to make room for the new terminal building.
机译:拉斯维加斯的麦卡伦国际机场正在滑行,准备建造一座新的18亿美元的第三航站楼,总部位于密苏里州圣路易斯的麦卡锡建筑公司正在对重要的民用建筑场地进行1.537亿美元的准备,为它。改进工作始于一年前。该项目由休斯顿建筑师PGAL设计,沿前罗素路(Russell Road)横跨70英亩的区域,该区域于去年在天堂路和斯宾塞街之间向北调整,为新航站楼腾出空间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号