...
首页> 外文期刊>Southwest Contractor >National Labs Eye Uncertain Results/Billions in Future Construction Remain in Limbo
【24h】

National Labs Eye Uncertain Results/Billions in Future Construction Remain in Limbo

机译:国家实验室对不确定的结果/数十亿美元的未来建设留在林博

获取原文
获取原文并翻译 | 示例
           

摘要

With billions of dollars in construction work hanging in the balance, discussions in Washington offer hope that dozens of national laboratories across the country could move ahead with megaprojects and on-going capital improvement plans. But political divisions run deep. In 2006, the science community was given a big boost by the passage of the American Competitiveness Initiative, which promotes the advancement of research to keep the nation at the forefront of innovation. Among the goals was a doubling of the Department of Energy's budget for the Office of Science, which oversees 21 major labs.
机译:由于数十亿美元的建筑工程悬而未决,华盛顿的讨论使人们希望,全国数十个国家实验室可以推进大型项目和正在进行的资本改善计划。但是政治分歧很深。 2006年,《美国竞争力计划》的通过极大地推动了科学界的发展,该计划推动了研究的发展,从而使美国始终处于创新的最前沿。目标之一是将能源部科学办公室的预算增加一倍,该办公室负责监督21个主要实验室。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号