首页> 外文期刊>Southeastern Oil Review >Tyson Will Attempt To Revive Output At Quentin Field
【24h】

Tyson Will Attempt To Revive Output At Quentin Field

机译:泰森将尝试在昆汀球场恢复生产

获取原文
获取原文并翻译 | 示例
           

摘要

R. W. Tyson Producing Co., Inc., Ridgeland, Miss., will attempt to revive production for Quentin Field in southwestern Mississippi's Franklin County. The company will re-enter the former German-Gulmon No. 1 Brookhaven Bank & Trust Co. et al 31-6, SENW Section 31-7N-5E, in an effort to revive production in Lower Tuscaloosa. Proposed clean out depth is 10,744 feet. Original completion was from pay in Lower Tuscaloosa from perforations at 10,657 3/4-665 3/4.
机译:位于密西根州里奇兰德的R. W.泰森生产有限公司将尝试恢复西南密西西比州富兰克林县昆汀油田的生产。为了恢复下塔斯卡卢萨岛的生产,该公司将重新进入原先的德国-哈尔蒙(Brookhaven Bank&Trust Co.)等31-6,SENW第31-7N-5E节。提议的清理深度为10744英尺。原始完工是从下塔斯卡卢萨(Tower Tuscaloosa)的穿孔处10,657 3 / 4-665 3/4的工资完成的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号