...
【24h】

Energy payback time and carbon footprint of commercial photovoltaic systems

机译:商业光伏系统的能量回收时间和碳足迹

获取原文
获取原文并翻译 | 示例

摘要

Energy payback time and carbon footprint of commercial roof-top photovoltaic systems are calculated based on new 2011 manufacturers' data; and on 2013 equipment manufacturers' estimates of "micromorph" silicon photovoltaic modules. The energy payback times and carbon footprints are 1.96, 1.24, 1.39, 0.92, 0.68, and 1.02 years and 38.1, 27.2, 34.8, 22.8, 15.8, and 21.4 g CO_2-eq/kWh for monocrystalline silicon, multicrystalline silicon, amorphous silicon, "micromorph" silicon, cadmium telluride and CIGS roof-top photovoltaic systems, respectively, assuming a poly-silicon production with hydropower; ingot-, wafer-, solar cell and module production with UCTE electricity; an irradiation on an optimized-angle of 1700 kWh/(m ~2×year); excluding installation, operation and maintenance and end-of-life phase. Shifting production of poly-silicon, ingots, wafers, cells and modules to China results in similar energy payback times but increases the carbon footprint by a factor 1.3-2.1, depending on the electricity intensity of manufacturing.
机译:商业屋顶光伏系统的能量回收时间和碳足迹是根据2011年新制造商的数据计算得出的;以及2013年设备制造商对“微晶型”硅光伏模块的估计。对于单晶硅,多晶硅,非晶硅,能量回收时间和碳足迹分别为1.96、1.24、1.39、0.92、0.68和1.02年,以及38.1、27.2、34.8、22.8、15.8和21.4 g CO_2-eq / kWh。假设使用水力发电生产多晶硅,分别称为“微晶”硅,碲化镉和CIGS屋顶光伏系统; UCTE电力生产硅锭,硅片,太阳能电池和组件;以1700 kWh /(m〜2×year)的最佳角度辐照;不包括安装,操作和维护以及寿命终止阶段。将多晶硅,硅锭,硅片,电池和组件的生产转移到中国会产生相似的能源回收时间,但是碳足迹会增加1.3-2.1倍,具体取决于制造的电力强度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号