The information flow for a building begins when a developer hires an architect to draw the plans and an engineer to certify the structure. Then the developer sends hundreds of two-dimensional drawing plans, elevations, and sections to general contractors for bid. Contractors expect delays in the construction process due to design errors, so they often pad their bids with contingencies of up to 15%, adding to building costs.
展开▼